Skip to content
EN
Site assessment
The HASHLYNK team in a meeting at the office

Site assessment

Assess your site’s potential

To assess your site properly, we need some information from you. Some fields are required, others optional — the more data you provide, the better the result.

Prepare for your assessment: What to clarify before a site assessment.

Your site details
1. Your enquiry

Fields marked with * are required.

Personal details
Site address
Privacy
Newsletter
2. Site details

Fields marked with * are required for the site assessment. Everything else is optional: share what you already know — we can discuss the rest together.

Installation & electricity generation

If known; otherwise we model the PV generation.

Feed-in & remuneration

Ideally state the average of the last 12 months or the expected remuneration.

Several files possible. For surplus feed-in, an annual amount or a usable annual profile is required. PDF (up to 2.5 MB) or CSV.

No file selected

Consumption

Not to be confused with grid import alone.

Several files possible. CSV files only.

No file selected

Electricity storage

Self-consumption takes priority. Free PV and storage energy for mining is simulated for your specific site.

Heat & heating
Additional details & files

Describe any relevant building, building services or automation details, such as smart home systems, heat distribution, buffer tanks, radiators, underfloor heating or concrete core activation.

Several files possible, for example photos, a system diagram or additional bills. Photos, PDF (up to 2.5 MB) or CSV. Photos are resized automatically.

No file selected